Drawing Management System

Manage drawings, resolve spacing issues, and coordinate approvals

Drawing Coordination Pain Points & Solutions

Drawing Spacing Resolution

Auto-validation of spacing measurements. Prevents 7.2m instead of 6m max column spacing.

Engineer-Contractor Coordination

Secure communication channels. Prevents unauthorized number exchanges.

Drawing Issue Tracking

Real-time issue tracking with measurement verification.

Field Issue Resolution

Critical issues like 4-inch instead of 8-inch brick work resolved through system.

Drawings (2)

Foundation Plan - Building A

changes requested
v2.3

Downtown Complex - Site A

Site A
Rajesh Sharma2025-03-15
2.4 MBstructural
250 sq ft
1 high priority issues

Electrical Layout - Floor 3

pending approval
v1.1

Downtown Complex - Site A

Site A
Priya Patel2025-03-12
1.8 MBelectrical
200 sq ft
1 high priority issues

Foundation Plan - Building A - v2.3

Downtown Complexfoundation

changes requested

Drawing Information

Created By:Rajesh Sharma
Created Date:2025-03-15
Last Modified:2025-03-20
File Size:2.4 MB
Drawing Type:structural
Category:foundation
Area:250 sq ft

Approval Status

Status:
changes requested
Approved By:Anil Kumar
Approved Date:Pending
Issues:2
Comments:2

Reviewers

Anil Kumar
Structural Engineer
pending
Priya Patel
Architect
approved
Raj Contractor
Contractor
pending

Issues (2)

spacing
high

Column spacing exceeds 6m maximum as per building code. Current spacing is 7.2m.

Reported by Anil Kumar on 2025-03-18

Resolution: Updated in v2.2 but still needs adjustment

Expected:6m max meters
Actual:7.2m meters
open
dimension
medium

Foundation dimensions do not match site survey measurements.

Reported by Contractor Team on 2025-03-19

Resolution: Updated dimensions in v2.3

Expected:Match survey centimeters
Actual:Off by 10cm centimeters
resolved

Comments (2)

Anil Kumar(Structural Engineer)2025-03-20 10:30

Spacing still needs adjustment. Maximum should be 6m per code.

Secure Communication
Raj Contractor(Contractor)2025-03-20 10:40

Understood. Will adjust the spacing as per engineer's instruction.

Secure Communication

Revision History

1.0
v1.0
Initial design
2025-03-10
2.0
v2.0
Updated column spacing
2025-03-12
2.1
v2.1
Added foundation details
2025-03-15
2.2
v2.2
Revised spacing per engineer feedback
2025-03-18
2.3
v2.3
Corrected spacing to 6m max
2025-03-20